Skip to main content

New Smartphone 16,000 mAh battery dual camera coming|| Energizer Power Max P16K Smartphone



Great things include some significant downfalls. We need highlight rich cell phones to watch recordings in high determination or play well known diversions however it is baffling when the battery gets depleted at regular intervals. In any case, how would we comprehend this issue? All things considered, control banks are a decent option yet we may have discovered a superior choice in another Energizer telephone called Power Max P16K Pro, which gloats of a tremendous 16,000mAh battery combined with a double camera. 

The Energizer Power Max P16K Pro will be authoritatively disclosed on Sunday, February 25, a day prior to the Mobile World Congress 2018 (MWC 2018) commences in Barcelona, Spain. It will conflict the declaration of Samsung's greatly built up lead, the Galaxy S9 and Galaxy S9+. 

The Energizer Power Max P16K Pro has a mammoth 16,000mAh battery with quick charging innovation, as indicated by GSMArena. It went ahead to state that the handset will gloat of double 13 MP + 5 MP sensors, a 8Mp selfie camera, a 5.99-inch screen with 2,160x1,080p determination, a MediaTek Helio P25 processor, a 6GB RAM and a 128GB inner stockpiling.

The USP of the Energizer Power Max P16K Pro will be its 16,000mAh battery, as it will resemble conveying a power bank and not a telephone. It has put down current best battery cell phones like Xiaomi Mi Max 2 (5300mAh), Gionee M7 Power (5000mAh), Moto E4 Plus (5000mAh), Samsung Galaxy A9 Pro (5000mAh), Lenovo P2 (5,100mAh), ZTE Blade A2 Plus (5000mAh), Asus Zenfone 3s Max (5000mAh), and Xiaomi Redmi 3S (5000mAh).



More Posts


Popular posts from this blog

Limitations of Terzaghi Theory

Limitations of Terzaghi Theory The value of the coefficient of consolidation has been assumed to be constant.  The distance d of the drainage path cannot be measured accurately in the field. The thickness of the deposit is generally variable, and an average value has to be estimated.  There is sometimes difficulty 1n locating the drainage face, sometimes thin previous seams that can act as good drainage face are missed in the boring operations. The equation is based on the assumption that the consolidation is one-dimensional. In the field, the consolidation is generally 3-dimensional. The lateral drainage may have a significant effect on the time rate of consolidation. The initial consolidation and secondary consolidation have been neglected. Sometimes these form an important part of the total consolidation. In actual practice, the pressure distribution may be far from linear or uniform. Read More Muller-Breslau principle

Price Guard Wire Method

Price Guard Wire Method Some form of  Price Guard Wire Method  is generally used to eliminate the errors caused by leakage currents over insulation. Fig. 3.14 illustrates the operation of This Method. In fig 3.14(a), a high resistance mounted on a piece of insulating material is measured by the ammeter voltmeter method. The micro-ammeter measures the sum of the current through the resistor (IR) and the current through the leakage path around the resistor. The measured value of resistance computed from the readings indicated on the voltmeter and the microammeter, will not be a true value but will be in error.   Figure 3.14 Application of  guard  circuit for measurement of high resistance In fig, 3.14 (b), the  guard  terminal has been added to the resistance terminal block. The  guard  terminal surrounds the resistance terminal entirely and is connected to the battery side of the micro-ammeter. The leakage current IL now

Negative Booster

Negative booster A negative booster is employed to conform to the regulation that the potential difference between any two points of the rail return shall not exceed 7 V. Two boosters, positive and negative, are used which are mechanically coupled together and driven by a DC motor. The positive booster is connected to the trolley wire (near the generating station) and the negative booster (separately excited) is connected to the track rail.  The 'positive booster' adds voltage to the line while the 'negative booster lowers the potential of the point it is connected to. As we go along the trolley wire away from the generating station/sub-station, the potential drop increases, and the voltage of the trolley wire falls. Since the current returns via the track rail points away from the generating station acquire high potentials. This potential is brought down by the negative boost provided by the negative booster. When the load is sufficiently far aw