Skip to main content

New Smartphone 16,000 mAh battery dual camera coming|| Energizer Power Max P16K Smartphone



Great things include some significant downfalls. We need to highlight rich cell phones to watch recordings in the high determination or play well-known diversions however it is baffling when the battery gets depleted at regular intervals. In any case, how would we comprehend this issue? All things considered, control banks are a decent option yet we may have discovered a superior choice in another Energizer telephone called Power Max P16K Pro, which gloats of a tremendous 16,000mAh battery combined with a double camera. 

The Energizer Power Max P16K Pro will be authoritatively disclosed on Sunday, February 25, a day prior to the Mobile World Congress 2018 (MWC 2018) commencing in Barcelona, Spain. It will conflict with the declaration of Samsung's greatly built-up lead, the Galaxy S9, and Galaxy S9+. 

The Energizer Power Max P16K Pro has a mammoth 16,000mAh battery with quick charging innovation, as indicated by GSMArena. It went ahead to state that the handset will gloat of double 13 MP + 5 MP sensors, an 8Mp selfie camera, a 5.99-inch screen with 2,160x1,080p determination, a MediaTek Helio P25 processor, 6GB RAM, and a 128GB inner stockpiling.

The USP of the Energizer Power Max P16K Pro will be its 16,000mAh battery, as it will resemble conveying a power bank and not a telephone. It has put down current best battery cell phones like Xiaomi Mi Max 2 (5300mAh), Gionee M7 Power (5000mAh), Moto E4 Plus (5000mAh), Samsung Galaxy A9 Pro (5000mAh), Lenovo P2 (5,100mAh), ZTE Blade A2 Plus (5000mAh), Asus Zenfone 3s Max (5000mAh), and Xiaomi Redmi 3S (5000mAh).

    Popular posts from this blog

    RS Aggarwal Aptitude Book PDF Free Download

    RS Aggarwal Aptitude Book PDF Free Download RS Agarwal Aptitude Book PDF Free Download: Quantitative Aptitude by R.S Aggarwal is a standout amongst the most inclining books among the hopefuls getting ready for Bank PO, PO, MBA, RBI, IBPS, CAT, SSC, IAS, PSC, Hotel Management, Railway Recruitment Exams, and other aggressive and placement tests. This book is suggested by different specialists in this field. This book covers relatively every theme which is being requested for the focused exams. On the off chance that you are looking to Download RS Aggarwal Quantitative Aptitude PDF's most recent version with the expectation of complimentary then you appear to be at the correct place.    Download PDF  RS Agarwal Aptitude Book PDF Free Download This book covers Problems on Surds and Indices, Simplification, Numbers and Ages, Pipes and Cisterns, Boats and Streams, Problems on Trains, Simple and Compound Interests, Time and Work, Permutations and Combination, Clocks, Odd Man Out, Heights

    Comparison between VSI and CSI

    Comparison between VSI and CSI In power electronic systems, inverters are an essential component that converts direct current (DC) into alternating current (AC). There are two main types of inverters used in power electronic systems: Voltage Source Inverters (VSI) and Current Source Inverters (CSI). Both have their own unique advantages and disadvantages, and the choice of which to use depends on the specific application and the desired outcome. Comparisons between voltage source inverters and current source inverters are as follows. In voltage source inverters, the input voltage is maintained constant and the amplitude of the output voltage does not depend on the load. However, the waveform of load current, as well as its magnitude, depends upon the nature of load impedance.  In current source inverters (CSI), the input current is constant but adjustable. The amplitude of output current from CSI is freelance of the load. However, the magnitude of output voltage and its undulation outp

    Limitations of Terzaghi Theory

    Limitations of Terzaghi Theory The value of the coefficient of consolidation has been assumed to be constant.  The distance d of the drainage path cannot be measured accurately in the field. The thickness of the deposit is generally variable, and an average value has to be estimated.  There is sometimes difficulty 1n locating the drainage face, and sometimes thin previous seams that can act as good drainage faces are missed in the boring operations. The equation is based on the assumption that the consolidation is one-dimensional. In the field, the consolidation is generally 3-dimensional. The lateral drainage may have a significant effect on the time rate of consolidation. The initial consolidation and secondary consolidation have been neglected. Sometimes these form an important part of the total consolidation. In actual practice, the pressure distribution may be far from linear or uniform.