Skip to main content

Romeo Akbar Walter Movie: John Abraham


Romeo Akbar Walter (RAW) movie is an up and coming 2019 Indian Hindi undercover work activity spine chiller film movie composed and coordinated by Robbie Grewal. It stars John Abraham, Mouni Roy, Jackie Shroff, and Sikandar Kher ahead of the pack roles. Initially, Sushant Singh Rajput was to star in the film as the hero however quit it because of his earlier duties. The film is inexactly founded on the life of Indian Spy Ravindra Kaushik. In Romeo Akbar Walter, John assumes the job of a RAW specialist who is sent to Pakistan for a mission 'that could change the course of history for India'. Roused by evident occasions, RAW rotates around a man who embarks to ensure his country against all indecencies and foes at the expense of his personality.





Romeo Akbar Walter
Romeo Akbar Walter




Romeo Akbar Walter Cast





  • John Abraham as Romeo/Akbar/Walter (RAW) Agent
  • Mouni Roy
  • Jackie Shroff
  • Sikander Kher
  • Suchitra Krishnamoorthi
  • Bikramjeet Kanwarpal
  • Boman Irani
  • Govind Namdev
  • Anil Mehta
  • Geetika Vidya Ohlyan
  • Tushar Tyagi




Romeo Akbar Walter Release Date





The primary look highlighting Sushant Singh Rajput had likewise been discharged before he quit the film. He was supplanted by John Abraham.





The film shot in Kashmir, was at first planned to discharge on 15 March 2019 however then it was pushed back. With its mystery discharged on the event of the Indian Republic Day, it was booked to discharge worldwide on 12 April 2019 however at this point slated to discharge on 5 April 2019.





The official trailer of the film was discharged on 4 March 2019


Popular posts from this blog

Limitations of Terzaghi Theory

Limitations of Terzaghi Theory The value of the coefficient of consolidation has been assumed to be constant.  The distance d of the drainage path cannot be measured accurately in the field. The thickness of the deposit is generally variable, and an average value has to be estimated.  There is sometimes difficulty 1n locating the drainage face, sometimes thin previous seams that can act as good drainage face are missed in the boring operations. The equation is based on the assumption that the consolidation is one-dimensional. In the field, the consolidation is generally 3-dimensional. The lateral drainage may have a significant effect on the time rate of consolidation. The initial consolidation and secondary consolidation have been neglected. Sometimes these form an important part of the total consolidation. In actual practice, the pressure distribution may be far from linear or uniform. Read More Muller-Breslau principle

Price Guard Wire Method

Price Guard Wire Method Some form of  Price Guard Wire Method  is generally used to eliminate the errors caused by leakage currents over insulation. Fig. 3.14 illustrates the operation of This Method. In fig 3.14(a), a high resistance mounted on a piece of insulating material is measured by the ammeter voltmeter method. The micro-ammeter measures the sum of the current through the resistor (IR) and the current through the leakage path around the resistor. The measured value of resistance computed from the readings indicated on the voltmeter and the microammeter, will not be a true value but will be in error.   Figure 3.14 Application of  guard  circuit for measurement of high resistance In fig, 3.14 (b), the  guard  terminal has been added to the resistance terminal block. The  guard  terminal surrounds the resistance terminal entirely and is connected to the battery side of the micro-ammeter. The leakage current IL now bypasses t

Negative Booster

Negative booster A negative booster is employed to conform to the regulation that the potential difference between any two points of the rail return shall not exceed 7 V. Two boosters, positive and negative, are used which are mechanically coupled together and driven by a DC motor. The positive booster is connected to the trolley wire (near the generating station) and the negative booster (separately excited) is connected to the track rail.  The 'positive booster' adds voltage to the line while the 'negative booster lowers the potential of the point it is connected to. As we go along the trolley wire away from the generating station/sub-station, the potential drop increases, and the voltage of the trolley wire falls. Since the current returns via the track rail points away from the generating station acquire high potentials. This potential is brought down by the negative boost provided by the negative booster. When the load is sufficiently far away from the generating stati