rel="canonical" href="https://www.selfstudyworld.com/" /> Highway Pavements Skip to main content

Highway Pavements

Highway Pavements

This Topic Highway Pavements From Highway Engineering And Civil Engineering. The surface of the road ought to be stable and non-yielding, to permit the serious wheel lot of road traffic to maneuver with the least doable rolling resistance. The paved surface ought to even be even on the longitudinal profile to alter the quick vehicles to maneuver safely and well at the look speed. 

At high moisture content, the soil becomes weaker and soft and starts yielding under heavy wheel loads, thus increasing the resistance to traction. The earth road may not be able to fulfill any of the above requirements, especially during the varying conditions of traffic and weather changes. Therefore a pavement consisting of superior and stronger materials is laid over the prepared earth surface which could fulfill the above requirements.
Highway Pavements


The objective of laying a pavement is to support the wheel loads and to transfer the load stresses through a wider area on the soil subgrade below. Thus the magnitude of stresses transferred to the subgrade soil through the pavement layers is considerably lower than the contact pressure or compressive stresses directly under the wheel load applied on the pavement surface. 

The reduction in the wheel load stress due to the pavement depends both on its thickness and the characteristics of the materials used in the different pavement layers placed over the soil subgrade. A pavement layer material is considered more effective or superior if it is able to distribute the wheel load stress through a larger area per unit thickness of the layer.

Depending on the vertical alignment and the environmental conditions of the site the pavement may be constructed over an embankment, cut, or almost at the gro level itself. It is always desirable to construct the pavement well above the maximum level of the groundwater or the highest water table, to keep the subgrade soil relatively dry even during monsoon season.

Popular posts from this blog

Limitations of Terzaghi Theory

Limitations of Terzaghi Theory The value of the coefficient of consolidation has been assumed to be constant.  The distance d of the drainage path cannot be measured accurately in the field. The thickness of the deposit is generally variable, and an average value has to be estimated.  There is sometimes difficulty 1n locating the drainage face, sometimes thin previous seams that can act as good drainage face are missed in the boring operations. The equation is based on the assumption that the consolidation is one-dimensional. In the field, the consolidation is generally 3-dimensional. The lateral drainage may have a significant effect on the time rate of consolidation. The initial consolidation and secondary consolidation have been neglected. Sometimes these form an important part of the total consolidation. In actual practice, the pressure distribution may be far from linear or uniform. Read More Muller-Breslau principle

Price Guard Wire Method

Price Guard Wire Method Some form of  Price Guard Wire Method  is generally used to eliminate the errors caused by leakage currents over insulation. Fig. 3.14 illustrates the operation of This Method. In fig 3.14(a), a high resistance mounted on a piece of insulating material is measured by the ammeter voltmeter method. The micro-ammeter measures the sum of the current through the resistor (IR) and the current through the leakage path around the resistor. The measured value of resistance computed from the readings indicated on the voltmeter and the microammeter, will not be a true value but will be in error.   Figure 3.14 Application of  guard  circuit for measurement of high resistance In fig, 3.14 (b), the  guard  terminal has been added to the resistance terminal block. The  guard  terminal surrounds the resistance terminal entirely and is connected to the battery side of the micro-ammeter. The leakage current IL now

Streamer Theory of Breakdown in Gases

Streamer Theory of Breakdown in Gases According to the Townsend theory firstly, current growth occurs as a result of the ionization process only. But in practice, breakdown voltages were found to depend on the gas pressure and the geometry of the gap. Second chances time lags of the order of 10-5 s, but practically it was observed to occur at a very short time of 10-8 s. Also, the Townsend mechanism predicts a very diffused form of discharge, that actually discharges were found to be filamentary and irregular. Townsend's mechanism failed to explain all these observed phenomena and as a result, The Streamer theory was proposed. The theory predicts the development of a spark discharge directly from a single avalanche in which the space charge developed by the avalanche itself is said to transform the avalanche into a plasma steamer. In Fig 1.7, a single electron starting at the cathode by ionization builds up an avalanche that crosses the gap. The electrons in the a