Hydro Power Plant

water because of its potential energy in certain areas provides the cheapest, neat and clean resource of energy. electricity produced by water represents hydropower. The development and prosperity of India depend to a large extent on our ability to generate and use hydroelectricity. it is the third most important source of energy after coal and petroleum in our country. Hydroelectricity is a cheap and renewable source which can be transported to long distance and is free from environmental pollution.
 

India has huge untapped identified potential in the hydro sector. The important hydel power region of India are the foothills of Himalaya in western Utter Pradesh and Himalaya Pradesh; region along western ghats running through Maharashtra, Karnataka, Tamil Nadu and Kerala; the region along the Satpura, vindhyas, and ranges in central India.

Except for the heavy initial investment, hydro project have a definite edge over the thermal power plants. hydropower projects not only provide cheap generation of electricity but are renewable generation and maintenance cost. there is no problem of pollution of the environment or disposal of waste matter generation of hydropower. In addition, the hydro project can also be used to meet the requirement of irrigation in the downstream areas and can also adequately meet the demands of power. But hydro project cause damage to the environment and fertile land. It also causes the problem of drowning in low lying areas. dams can also alter the natural river flow and affect wildlife.


More Posts

Popular posts from this blog

Limitations of Terzaghi Theory

Limitations of Terzaghi Theory The value of the coefficient of consolidation has been assumed to be constant.  The distance d of the drainage path cannot be measured accurately in the field. The thickness of the deposit is generally variable, and an average value has to be estimated.  There is sometimes difficulty 1n locating the drainage face, sometimes thin previous seams that can act as good drainage face are missed in the boring operations. The equation is based on the assumption that the consolidation is one-dimensional. In the field, the consolidation is generally 3-dimensional. The lateral drainage may have a significant effect on the time rate of consolidation. The initial consolidation and secondary consolidation have been neglected. Sometimes these form an important part of the total consolidation. In actual practice, the pressure distribution may be far from linear or uniform. Read More Muller-Breslau principle

Price Guard Wire Method

Price Guard Wire Method Some form of  Price Guard Wire Method  is generally used to eliminate the errors caused by leakage currents over insulation. Fig. 3.14 illustrates the operation of This Method. In fig 3.14(a), a high resistance mounted on a piece of insulating material is measured by the ammeter voltmeter method. The micro-ammeter measures the sum of the current through the resistor (IR) and the current through the leakage path around the resistor. The measured value of resistance computed from the readings indicated on the voltmeter and the microammeter, will not be a true value but will be in error.   Figure 3.14 Application of  guard  circuit for measurement of high resistance In fig, 3.14 (b), the  guard  terminal has been added to the resistance terminal block. The  guard  terminal surrounds the resistance terminal entirely and is connected to the battery side of the micro-ammeter. The leakage current IL now

Negative Booster

Negative booster A negative booster is employed to conform to the regulation that the potential difference between any two points of the rail return shall not exceed 7 V. Two boosters, positive and negative, are used which are mechanically coupled together and driven by a DC motor. The positive booster is connected to the trolley wire (near the generating station) and the negative booster (separately excited) is connected to the track rail.  The 'positive booster' adds voltage to the line while the 'negative booster lowers the potential of the point it is connected to. As we go along the trolley wire away from the generating station/sub-station, the potential drop increases, and the voltage of the trolley wire falls. Since the current returns via the track rail points away from the generating station acquire high potentials. This potential is brought down by the negative boost provided by the negative booster. When the load is sufficiently far aw